Designing a home is a complex process that involves thousands of decisions. A great home is a melting pot of the client’s needs and wants, the constraints of the site, the structural system, the mechanical systems, the materials available regionally, the budget, the contractor and subcontractors skill-set, and many other small decisions, inspirations, and challenges along the way. A good designer can synthesize and distill all of this information and guide client’s through the process well. A great designer does that while limiting bumps in the road, anticipating and overcoming future obstacles.

Our process is a time-tested way of bringing all of the constraints of a home together in a way that yields a near-perfect final product. We guide you from the high-level, bird’s eye view of your site and your region to the very details that hold your house up and withstand the test of time.

The ‘phases’ of the design process are Pre-Design, Schematic Design, Design Development, and Construction Documentation. Some clients opt to also have their designer on-site during critical moments of construction, a process known as Construction Administration.

Pre-Design (10% of total project)

  • New Client Survey

  • Budget Analysis

  • Client Program

  • Site Anaylsis

  • Code Analysis

  • Zoning Analysis

  • HOA Analysis

  • Owner Meeting

Schematic Design (25% of total project)

  • Schematic Floor Plan

  • Schematic Elevation

  • Sketches

Design Development (25% of total project)

  • 3D model of building and site

  • Photorealistic Rendering

  • Virtual Reality

Construction Documentation & Permitting (40% of total project)

  • Issue for Construction Drawing Set for Contractor and for the building permitting department:

    • Site Plan

    • Floor Plan

    • Roof Plan

    • Exterior Elevations

    • Building Sections

    • Building Wall Sections / Details

    • Interior Elevations

    • Electrical Plan

    • Foundation Layout

    • Landscape Plan

  • Pre-Construction Meeting with Contractor

Construction Observation (additional service, not included in % of total project)

Site observation at critical points in construction, including:

  • Pre-Pour - prior to the foundation pour - measure pre-pour drops (ex. for the large slider) and drain locations (ex. for shower drains and toilet drains).  

  • Framing and Pre-Mechanical - prior to mechanical (after hvac and mechanical systems go in, it becomes very costly to make framing changes).

  • Post-Insulation - Thermal Testing and insurance of a tight building envelope before moving forward.

  • Cabinets - prior to cabinet construction - review and approval of cabinet shop drawings and mockup on-site.

  • Pre-Landscape Install